Project Name | Description | Date of Upload | Download | Status |
---|---|---|---|---|
AA/ONDSF/ DISAIJAN/2018 | EOI to obtain Environmental Clearance from the MoEF & CC, State/ National Wild Life Board | 2019-08-31 | Download |
CLOSED
|
PY-3 field, Block CY-OS-90/1 | EOI under ICB for Floating Production Services , Anchor Handling Tug (AHTS) & Offshore Supply VesselServices (OSV),3. Offshore Gas Compression package | 2019-10-17 | Download |
OPEN
|
PY-3 field, Block CY-OS-90/1 | EOI under ICB for Design, Fabrication and Installation of Flexible Lines & Umbilical’s | 2019-12-03 | Download |
OPEN
|
PY-3 field, Block CY-OS-90/1 | EOI under ICB for various services required for Function Testing of JV Owned Surface / Subsea equipment’s in PY-3 field. | 2020-08-17 | Download |
OPEN
|
PY-3 field, Block CY-OS-90/1 | EOI under ICB for various services required for Recommencement of Production from PY-3 field. | 2020-12-03 | Download |
OPEN
|
PY-3 field, Block CY-OS-90/1 | EOI under international competitive bidding for FPSO | 2022-05-23 | Download |
OPEN
|
AA/ONDSF/ DISAIJAN/2018 | For provision of Land Drilling Rig, Supply of Tangibles and Drilling Allied Services | 2022-10-18 | Download |
OPEN
|
SP-ONHP(CBM)-2021/1 | IPLCBM22B034: for obtaining Environmental Clearance under category ‘B2’ Projects from MP-SEIAA for SP-ONHP(CBM)-2021/1 Contract Area. | 2023-01-18 | Download |
OPEN
|